Unofficial demo — We remove it on request.

Approved in Ekurhuleni.

Residential building plans drawn in Alberton, then taken through City of Ekurhuleni approval by Taelo.

Ring and describe the erf. You hear back from Taelo, not a call centre.

DrawingA-001 · 1:100 · Rev A
DrawnT. Mengwai
5.0 from 27 Google reviewsEvery one of them five stars

RA-MeLT Architectural Consulting (Pty) Ltd. CIPC K2022688038. Working in Alberton, New Redruth, Katlehong, Vosloorus, Boksburg, Germiston. City of Ekurhuleni submissions. 5.0 from 27 Google reviews.

What actually lands on the council’s desk.

Site plan, floor plans, elevations, sections and schedules. Every line answers the National Building Regulations.

RA-MeLT draws the set, lodges it with City of Ekurhuleni building control and stays on the file until it comes back.

PracticeRA-MeLT Architectural Consulting
RegistrationCIPC K2022688038
Trading since2022
Submits toCity of Ekurhuleni
+2 700 WALL PLATE220 CAVITY WALLSTRIP FOOTINGDPC±0.000 FFLNGL26°2 700SECTION A-A · SCALE 1:20 · DWG A-04
A wall section from a residential set. Drawn, not photographed.

Five things get drawn here.

Sheet numbers are how a set is filed. Yours gets its own.

  • A-01

    New house plans

    Site plan, floor plans, elevations, sections

    A full set, drawn to the scale building control accepts.

  • A-02

    Alterations and additions

    Measure-up, existing and proposed drawings

    The back room, the second storey, the garage conversion. Measured on site first.

  • A-03

    Council submission and follow-up

    Submission set, lodgement, progress calls

    Lodged with City of Ekurhuleni building control, then chased until it comes back.

  • A-04

    As-built and existing drawings

    On-site measure-up, drawn record of the house

    For a house built or extended without an approved plan on record.

  • A-05

    Site plans and boundary checks

    Erf layout, building lines, coverage

    What the erf allows, checked before anything is drawn.

Call Taelo · 072 019 9874

Describe the job on the call and ask what it costs.

Six stages, and one of them is not ours.

Stage 01 of 6

The route a set takes from the first phone call to a stamped plan, and where City of Ekurhuleni takes over the clock.

  1. Stage 01

    The call

    Describe the erf and the build. Taelo explains what building control will ask for.

  2. Stage 02

    Measure and sketch

    Taelo measures what stands on site, then sends a first sketch for you to mark up.

  3. Stage 03

    The drawing set

    Site plan, floor plans, elevations and sections, drawn to submission standard.

  4. Stage 04

    Lodged with the city

    The set goes to City of Ekurhuleni building control.

  5. Stage 05

    The wait

    The council sets this clock. Two reviewers said approval ran long, and both said they were kept informed.

  6. Stage 06

    Approved

    Stamped plans come back to you, and your builder can break ground.

Line, wall, roof, keys.

Reference photography. RA-MeLT’s own project photographs replace these on handover.

Architectural blueprints laid flat with drafting pencils, a metal scale rule and a drawing tube
A-011:100
1:100Drawing set, laid out
A single storey brick house under construction with its timber roof trusses standing
B-011:100
1:100Trusses up, roof to follow
A finished two storey plastered house with a tiled roof seen from the street
C-011:200
1:200What the drawing was for
A pencil resting on a dimensioned technical drawing showing setting-out measurements
A-021:20
1:20Set out, dimension by dimension
A bricklayer working on top of a rising face brick wall on a building site
B-021:50
1:50Walls to lintel height
A black and white photograph of a walled suburban house behind a gate and a tree
C-021:200
1:200Boundary wall, building line, street
A red brick house shell under construction on a sunny day with openings framed out
B-031:100
1:100Openings set out from the plan
A single storey house at dusk with a lit fountain in the front garden
C-031:200
1:200Handed over, lived in

Twenty-seven reviews. Not one of them under five stars.

Read them on Google
  • Rated 5 out of 5

    …Their team communicated clearly throughout the entire process, ensuring I was involved and informed at every stage.

    Grace Mfunyo

    2 months ago · Google

    Read this review
  • Rated 5 out of 5

    What I mostly appreciate from the company is the exceptional attention to detail, the delivery of the client’s vision of the desired plan.…

    Naku Ndlovu

    7 months ago · Google

    Read this review
  • Rated 5 out of 5

    I found Taelo through a neighbor’s home upgrade… He delivered a brilliant house plan and gave honest, practical advice throughout for me.

    dimakatso tsoke

    10 months ago · Google

    Read this review
  • Rated 5 out of 5

    My building plan delayed a lot from the council, longer than I had expected and I was disappointed but I’m otherwise impressed with regular communication for updates I got.…

    hlalele mathetse

    a month ago · Google

    Read this review
  • Rated 5 out of 5

    …Taelo is humble, persistent and determined to get the positive result.

    Phindile Kesai Nkosi

    9 months ago · Google

    Read this review
  • Rated 5 out of 5

    Working with RA-Melt architectural, in Alberton has been stress free experienced for me, because they put clients 1st…

    Thabisile Dube

    10 months ago · Google

    Read this review

The person who answers

Taelo Legohu Mengwai

Director and architectural designer

Registered with the CIPC in August 2022, enterprise number K2022688038. He takes the call, measures the house, draws the set.

That is why the reviews say “Taelo” and not “the team”. One designer, one file at a time.

Call Taelo · 072 019 9874
A hand-drawn plan sheet on a wooden table with its title block visible in the corner
Drawn byT. L. Mengwai
CheckedT. L. Mengwai
The title block carries the file

Where the work is.

Alberton and the wider City of Ekurhuleni metro. Taelo knows which building control office your file goes to.

  • Alberton
  • New Redruth
  • Katlehong
  • Vosloorus
  • Boksburg
  • Germiston
  • + Ekurhuleni

The office

Office No. F35
33 Newquay Rd, New Redruth
Alberton, 1449

Open

Monday to Friday, 08:00 to 18:00
Closed Saturday and Sunday

Getting there

Open in Google Maps

The five questions that come up first.

How long does council approval take?

That clock belongs to City of Ekurhuleni. Two of twenty-seven reviewers said approval ran long — both still gave five stars.

What do you need from me to start?

The erf number, the street address, and what you want to build. If a house already stands there, Taelo measures it on site.

Do you submit the plans to the council, or do I?

RA-MeLT lodges the set with City of Ekurhuleni building control and follows it up. You get progress calls, not a folder.

What does a set of plans cost?

It depends on the build and whether there is a house to measure. Ring Taelo and describe the stand to ask for a quote.

Do you work in my area?

Alberton and the wider City of Ekurhuleni metro: New Redruth, Katlehong, Vosloorus, Boksburg and Germiston.

Describe the erf. Taelo will tell you what it needs.

No contact form, on purpose. This practice runs on one phone, answered by the person who does the drawing.

072 019 9874

Office

Office No. F35
33 Newquay Rd
New Redruth, Alberton
1449, South Africa

Hours

Monday to Friday, 08:00 to 18:00
Closed Saturday and Sunday

Working in

Alberton, New Redruth, Katlehong, Vosloorus, Boksburg, Germiston and the wider City of Ekurhuleni.

PracticeRA-MeLT Architectural Consulting (Pty) Ltd
RegistrationCIPC K2022688038
DirectorTaelo Legohu Mengwai
Submits toCity of Ekurhuleni
Call TaeloWhatsApp